At first, the Jai Hind metro station was prepared for being elevated. However, the AAI objected the elevated stretch up into the airport may possibly pose a threat to aircraft, Hence the route was further reworked plus the station was shifted underground, 150 m through the Airport terminal developing. A https://zionkoqqq.life3dblog.com/31212178/railway-recruitment-kolkata-rrb-group-d-32000-vacancy-pdf