Primary Port has concluded the update of 217m with the substitute of decayed timber piles and beams, the construction of a completely new concrete deck, plus the installation of larger ability bollards and fandering process. […] The bridge was a 38.3m metal frame truss with GEOTUB modular 900mm columns and http://www.radarservices.com.au/